Downloads

DNS Pre-application consultation

The DNS pre-application consultation period ended on the 20th of May 2016. Thank you for providing comments, these have been reviewed and will be included in the application submission.

 

Updates with the application process will be posted on the website.

 

If you would like to contact Egnedol regarding employment opportunities, the development or anything else then you can still get in touch using the following methods:-

1.       Feedback and Comments form to the right of this page

2.       Emailed to info@egnedol.com

3.       Posted to Egnedol Wales Ltd, 1 St Marys Street, Carmarthen, Carmarthenshire, SA31 1TN

Environmental Impact Assessment

Click to download PDF files (Adobe Acrobat Reader required – download here)

Fill out my online form.

Cover and contents

(1.2mb)

Introduction

(846kb)

Project rationale
and project benefits

(830kb)

Site selection, technology selection and project description

(5.2mb)

Methodology

(733kb)

Drainage and flood risk

(2.6mb)

Planning policy

(934kb)

Land use and
contaminated land

(3.5mb)

Air quality

(1.5mb)

Landscape and visual impact

(3.5mb)

Ecology

(12.1mb)

Noise and vibration

(1.9mb)

Traffic and feedstock logistics

(1.2mb)

Services and utilities

(3.8mb)

Grid connection

(6.6mb)

The jetty

(924kb)

Archaeology and
cultural heritage

(2.3mb)

Socio-economics

(323kb)

Consultation and
community liaison

(305kb)

Cumulative impacts

(671kb)

Cover Letter

Design and

Access Statement

Non-technical

Summary

Habitats Risk Assessment

Consultation

Report

Cover Letter

(193kb)

Design and Access Statement

(4mb)

Non-technical summary

(435kb)

Habitats Risk Assessment

(651kb)

Consultation Report

(33mb)

Application forms

Application notices

Environmental Impact Assessment Appendices

Environmental Impact Assessment Drawings

3.1 Scoping Request and Response

6356-Scoping-Request.pdf

Final-Scoping-Request-Milford-Haven-compressed.pdf

 

3.2 Historical assessment reports

March-16-Blackbridge-Site-Data.pdf

Waterston-Contaminated-Land-Review.pdf

 

3.3 Groundsure Reports

HMD-142-2449131.pdf

HMD-142-2449132.pdf

 

3.4 Groundsure Historical Maps (Largescale)

HMD-142-2449133-2500-Scale-Index.pdf

HMD-142-2449133-LS-1-3-largeScale.pdf

HMD-142-2449133-LS-1-4-largeScale.pdf

HMD-142-2449133-LS-2-2-largeScale.pdf

HMD-142-2449133-LS-2-3-largeScale.pdf

HMD-142-2449133-LS-2-4-largeScale.pdf

HMD-142-2449133-LS-2-5-largeScale.pdf

HMD-142-2449133-LS-3-2-largeScale.pdf

HMD-142-2449133-LS-3-3-largeScale.pdf

HMD-142-2449133-LS-3-4-largeScale.pdf

HMD-142-2449133-LS-4-3-largeScale.pdf

HMD-142-2449133-LS-4-4-largeScale.pdf

HMD-142-2449133-LS-4-5-largeScale.pdf

HMD-142-2449133-LS-5-1-largeScale.pdf

HMD-142-2449133-LS-5-2-largeScale.pdf

HMD-142-2449133-LS-5-3-largeScale.pdf

HMD-142-2449133-LS-5-4-largeScale.pdf

HMD-142-2449133-LS-5-5-largeScale.pdf

HMD-142-2449133-LS-6-1-largeScale.pdf

HMD-142-2449133-LS-6-2-largeScale.pdf

HMD-142-2449133-LS-6-3-largeScale.pdf

HMD-142-2449133-LS-6-4-largeScale.pdf

HMD-142-2449133-LS-6-5-largeScale.pdf

HMD-142-2449133-LS-7-2-largeScale.pdf

HMD-142-2449133-LS-7-3-largeScale.pdf

HMD-142-2449133-LS-7-4-largeScale.pdf

 

3.4 Groundsure Historical Maps (Smallscale)

HMD-142-2449133-Small-Scale-Index.pdf

HMD-142-2449133-SS-1-1-smallScale.pdf

HMD-142-2449133-SS-1-2-smallScale.pdf

HMD-142-2449133-SS-2-1-smallScale.pdf

HMD-142-2449133-SS-2-2-smallScale.pdf

HMD-142-2449133-SS-3-1-smallScale.pdf

HMD-142-2449133-SS-3-2-smallScale.pdf

 

3.5 Visual Impact Appendices

Full-Visual-Impact-Report.pdf

VP1-Existing.jpg

VP1-Proposed.jpg

VP2-Existing.jpg

VP2-Proposed.jpg

VP3-Existing.jpg

VP3-Proposed.jpg

VP4-Existing.jpg

VP4-Proposed.jpg

VP5-Existing.jpg

VP5-Proposed.jpg

VP6-Existing.jpg

VP6-Proposed.jpg

 

3.6 Noise Monitoring Results and Calibration Certificate

All-certs-combined.pdf

HDD-Noise-Monitoring-Report-Blackbridge.pdf

 

3.7 Feedstock Codes

Feedstock-Codes.pdf

 

3.8 Archaeology Appendices

archaeology-appendix.pdf

Report-1426-Blackbridge-MH-ASIDOHL-11-01-16.pdf

 

3.9 Ecology

2015-2016-Bat-Survey-Report.pdf

AECOM-2011-Ecology-Report.pdf

Blackbridge-Site-Otter-Assessment-report.pdf

Jetty-marine-ecology-assessment.pdf

Waterston-Ecological-Appraisal-FINAL-100513.pdf

Waterstone-Site-Otter-Assessment-report.pdf

 

3.10 Traffic and Transportation

04-Aug-15-Traffic-Survey.pdf

24-Sep-15-Traffic-Survey.pdf

28-Sep-15-Traffic-Survey.pdf

1606-24-Framework-Travel-Plan-Issue-FULL.pdf

1606-24-Transport-Assessment-v1-0-25-07-2016-Complete.pdf

 

3.11 Jetty

Historical-drawings-and-specifications.pdf

Standard-Permit-Maintenance.pdf

Structural-Inspection-Survey-of-Milford-Haven-Jetty-Piles.pdf

 

3.12 HDD Grid Connection

HDD-Grid-Connection-Final.pdf

Drawing-Register.pdf

AP-15-07-P16-Packaging-Facility-AP-Mar-16.pdf

EGW-01-001-MASTERMAP-04-11-16-revC.pdf

EGW-01-002-BLACKBRIDGE-ECO-PARK_revC.pdf

EGW-01-003-BIOMASS-BtEf_revC.pdf

EGW-01-004-WATERSTON-ECO-PARK.pdf

EGW-01-005-EXISTING-11KV.pdf

EGW-01-006-EXISTING-GAS-MAIN.pdf

EGW-01-007-EXISTING-SURFACE-WATER-DRAINAGE.pdf

EGW-01-008-EXISTING-WATER-MAIN.pdf

EGW-01-009-ECOLOGY-MITIGATION-revA.pdf

EGW-01-010-EXISTING-ELECTRICITY-CABLES-WATERSTON.pdf

EGW-01-011-EXISTING-GAS-MAIN-WATERSTON.pdf

EGW-01-012-EXISTING-FOUL-SEWER-WATERSTON.pdf

EGW-01-013-EXISTING-WATER-MAIN-WATERSTON.pdf

EGW-01-014-PROPOSED-11KV-CABLES-revA.pdf

EGW-01-015-PROPOSED-GAS-MAINS-revA.pdf

EGW-01-016-PROPOSED-NEW-WATER-MAIN-revA.pdf

EGW-01-017-PROPOSED-NEW-FOUL-DRAINAGE-WATERSTON-revA.pdf

EGW-01-018-PROPOSED-NEW-SURFACE-WATER-DRAINAGE-WATERSTON-revA.pdf

EGW-01-019-PROPOSED-NEW-POTABLE-WATER-WATERSTON-revA.pdf

EGW-01-020-PROPOSED-SURFACE-AND-FOUL-WATER-DRAINAGE-revA.pdf

EGW-01-021-PROPOSED-ELECTRICAL-SUPPLY-WATERSTON-revA.pdf

EGW-01-022-Upgraded-Road-Blackbridge.pdf

EGW-01-023-Upgraded-Road-Waterston.pdf

EGW-01-024-Grid-Connection.pdf

EGW-01-025-Jetty-Frames-Existing.pdf

EGW-01-026-Bathymetric-Data-for-Directional-Drilling.pdf

EGW-01-027-NEW FENCELINE-WATERSTON.pdf

EGW-01-028-NEW ENTRANCE-WATERSTON.pdf

EGW-01-029-Jetty-Cross-Section-with-Conveyor-on.pdf

EGW-01-030-Site-Development-Areas.pdf

EGW-01-031-New-Car-Park-and-Footpath-Waterston.pdf

EGW-01-032-New-Car-Park-and-Footpath-Waterston(2).pdf

EGW-01-033-Phase-1-Habitat-Map-Map-and-Key.pdf

EGW-01-034-Jetty-Frames-Proposed.pdf

EGW-01-035-Conveyor-Route.pdf

EGW-01-036-EXISTING-ROAD-NETWORK.pdf

EGW-01-037-Designated-conservation-area_revA.pdf

EGW-01-038-Badger-Survey-Results.pdf

EGW-01-039-Locations-of-the-Four-Distinct-Areas.pdf

EGW-01-041-DNS-and-Secondary-Consent-Boundaries.pdf

Existing-and-Proposed-Contours-Blackbridge-and-Waterston.pdf

HG-15-07-P01-AQUACULTURE-UNITS-21-AP-Mar-16.pdf

HG-15-07-P02-AQUACULTURE-UNITS-22-AP-Mar-16.pdf

HG-15-07-P03-Cheese-Factory-AP-Feb-16.pdf

HG-15-07-P04-Control-Building-Existing-and-Proposed-AP-Feb-16.pdf

HG-15-07-P06-Pyrolyser-and-Grinding-Hall-Existing-AP-Feb-16.pdf

HG-15-07-P07-Pyrolyser-and-Grinding-Hall-Proposed-AP-Feb-16.pdf

HG-15-07-P08-STORAGE-BUILDING-AD-july16-STORAGE-BUILDING-PLAN-SECTION-AND-ELEVATION.pdf

HG-15-07-P09-Dryer-Hall-AP-Feb-16.pdf

HG-15-07-P10-Engine-HoHG-15-07-P11-Exhaust-Gas-Conditioning-and-Algae-Propagation-AP-Feb-16.pdfuse-AP-Feb-16.pdf

HG-15-07-P12-Algae-buildings-AP-Feb-16.pdf

HG-15-07-P13-Greenhouse-Structures.pdf

HG-15-07-P14-MV-ROOM-AP-Feb-16.pdf

HG-15-07-P15-COLD-IRONING-BUILDING-AP-Feb-16.pdf

EGW-01-01-051-Chimney-Stack-GA.pdf

© Copyright 2015 Egnedol BioEnergy Limited